Monday, October 16, 2023

8 New Government Job Opportunities at ZECO October, 2023 - Various Posts

  AjiraLeo Tanzania       Monday, October 16, 2023
Zanzibar Electricity Corporation (ZECO)
Jobs in Tanzania 2023: New Government Job Vacancies at Zanzibar Electricity Corporation (ZECO) 2023
Zanzibar Electricity Corporation (ZECO) Jobs, 2023
ZECO Background
Our History: The development of the electricity sector in Zanzibar started in the beginning of the 20th century. In the year 1908, coal-fired generators were first installed to provide Electricity in Unguja Island. In 1954 the coal technology was abandoned and diesel Generators introduced and used until 1980, when Unguja Island was connected to the Tanzania National Grid, through a 132kV 45MW sub-marine cable, in 2013 new Submarine was connected with capacity of 132kV 100MW which is still in use to date.

Public electricity supply in Pemba Island was installed in 1958, with the Commissioning of the Tibirinzi power station. Over the years additional small generating units were installed by the Revolutionary Government of Zanzibar, in response to the growing demand. In 1985, the Government commissioned Wesha power station to replace Tibirinzi power station, with three diesel generators sets of 1.5MW each. To date, Pemba Island connected with national grid by Sub marine cable from Pangani via Majani Mapana Tanga to Ras Mkumbuu Pemba, with the capacity of 20MW, 33kV.

The State Fuel and Power Corporation (SFPC) was established in 1964 under the then Ministry of Water, Construction, Land and Environment by Presidential Decree No. 12 of 1964. It was made responsible for managing the power stations and providing services on both islands. Sector reform under the Act No.3 of 2006 transferred regulatory issues from the utility to the parent ministry and established the Zanzibar Electricity Corporation (ZECO) thereby replacing ZSFPC to facilitate the generation, transmission, transformation, distribution, supply and use of electricity in the Islands of Zanzibar.

ZECO is 100% owned by the Government through the Ministry of Land, Housing,Water and Energy, which assumes a supervisory role to the Corporation. The Corporation is governed by the board of directors, appointed by the Government who supervise the ZECO management and ensure the implementation of the Government’s policies. ZECO is expected to provide reliable and affordable electricity in Zanzibar, as an important input in boosting economic growth and social development in the isles. Posted by Editorial Staff from AjiraLeo.com

New Job Vacancies at Zanzibar Electricity Corporation (ZECO) October, 2023
BONYEZA HAPA CHINI KUSOMA MAELEZO KAMILI AND MODE OF APPLICATION: Follow the link below to read full jobs details and mode of application...
Position: Various Posts (8 Vacancies)
Deadline: 23rd October, 2023.
DOWNLOAD PDF FILE CLICK HERE!
logoblog

Thanks for reading 8 New Government Job Opportunities at ZECO October, 2023 - Various Posts

Previous
« Prev Post

No comments:

Post a Comment